Robnett Electric, Inc.

Completed Projects

MTA BLUELINE STATIONS, LONG BEACH TO DOWNTOWN L.A.

Job:Installation of Variable Message signs and related AC/Comm. Cable to (22) Blueline Stations.
Contr.:L.K. Comstock Company
Contact:Paul Macris (323) 913-4188
Completed:September 1996

MTA DIVISION 2 BUS MAINTENANCE YARD

Job:Installation of new electrical system to maintenance building including main switchboards, panelboards, emergency generator & transfer switches, emergency light, and fire alarm system.
Contr.:Now Construction
Contact:Harish Vora (562) 693-5207
Completed:February 1999

MTA OP-3343-0515 : UNDERGROUND TANK REPLACEMENT AT MTA DIV. 8 CHATWSORTH

Job:Installation of conduit, power, data, and control wiring to underground tank farms consisting of diesel, waste fuel, unleaded gas, motor oil, waste oil, torque oil and solvent tanks, transfer switches, emergency light, and fire alarm system.
Contr.:A.E. Schmidt
Contact:Jerry Chessnut (818) 786-2373
Completed:February 1999

MTA LONG BEACH PLATFORM EXTENSION C0630

Job:Extend PA, CCTV, PTEL, Lighting, Emergency Power on (19) platform extensions.
Contr.:J.A. Jones Construction
Contact:Thomas Lee, MTA (213) 922-7284
Completed:June 2001

MTA GATEWAY 2ND FLOOR COMPUTER ROOM EXPANSION & TELECOMMUNICATIONS ROOM MODIFICATIONS

Job:Provide AC power to air conditioning units and water coolers
Contr.:A&P Construction
Contact:Thomas Lee, MTA (213) 922-7284
Completed: 

MTA C0656: DIV. 1, DIV. 20, AND REBUILD CENTER ADA UPGRADES

Job:Upgrade the existing fire alarm system at 3 locations for ADA compliance.
Contr.:A&P Construction
Contact:David Compton, MTA (213) 922-7279
Completed:June 2002

MTA TRAIN WASH AT DIVISIONS 11 & 20

Job:Electrical and control installation of NS Train Wash System
Contr.:NS Corporation
Contact:Tom Welch, MTA (213) 922-7279
Completed:March 2003

MTA BUS INTERIOR VACUUM BELLOWS SYSTEM UPGRADE CONTRACT No.OP-33410654

Job:Electrical and control installation of NS Bus Vacuum System
Contr.:NS Corporation
Contact:Edward Schmutzler, MTA (213) 922-7279
Completed: 

MTA DIVISION 8 VAULT HOUSES

Job:Electrical and Communications installation of (2) Vault Houses
Contr.:A&P Construction
Contact:Raul Pedroza, MTA (213) 922-7279
Completed: 

MTACO651–RRC CHEMICAL BUILD & LOUNGE (DESIGN/BUILD)

Job:Electrical Desing/Build to include power/lighting, and Fire Alarm.
Contr.:A&P Construction
Contact:Rick Noone MTA (213) 922-7279
Completed:August 2003

MTA CO678 – ADA COMPLIANCE AT DIVISION 5

Job:Upgrade the existing fire alarm system.
Contr.:Larry Brown Construction
Contact:Raul Pedroza MTA (213) 922-7279
Completed:April 2003

MTA CO703 BUS DIV 2, 9, AND RRC LIGHTING UPGRADE (DESIGN/BUILD)

Job:Design/Build. Design and installation of new lights at (3) MTA facilities
Contr.:Robnett Electric, Inc
Contact:Frank Foster, Contract Administrator MTA 213-922-3716
Completed:June 2004

MTA CO705 BUS EXHAUST SYSTEM AT DIVISION 2 & THE RRC.

Job:Installation of power to Bus Exhaust Systems.
Contr.:NS CORPORATION
Contact:Raul Pedroza MTA (213) 922-7279
Completed:June 2004

MTA 03-0020 VERTICAL STORAGE CAROUSEL AT MTA DIV. 11, 21, 22

Job:Installation of power to Vertical Storage Material Parts Carousels.
Contr.:A&P Construcrion
Contact:Rick Shirley MTA (213) 922-1454
Completed:April 2003

MTA C0750 DIVISION 7 TRANSPORTATION BUILDING UPGRADES

Job:Lighting, power, data, and CCTV upgrades.
Contr.:A&P Construction
Contact:Raul Pedroza MTA (213) 922-7279
Completed:May 2005

MTA C0753 DIVISION 7 FACILITIES IMPROVEMENTS

Job:Lighting, Power and Gas Montioring upgrades.
Contr.:A&P Construcrion
Contact:Raul Pedroza MTA (213) 922-7279
Completed:

MTA UNIVERSAL FARE SYSTEM (UFS) OP-002 (Design/Build)

Job:Design of conduit & cabling. Installation of (155) Stand Alone Validators, and (303) Ticket Vending Machines (TVM’s). This installation includes the installation, terminating and testing of AC power, Cat-5, and multimode fiber optic cable. The UFS installation includes all MTA passenger stations (Redline, Blueline, Greenline, Pasadena Goldline, and Metrolink stations). The TVM’s on the Pasadena Goldline are currently operational. Robnett Electric. Inc. is the turnkey installation subcontractor.
Contr.:Cubic Transportation Systems
Contact:James Cohen, Contract Resident Engineer MTA 213-922-6387
Completed:

MTA RETROFIT OF THE METRO RED LINE SEGMENT ONE GAS MONITORING SYSTEM CONTRACT NO. OP-3346-0642 (Design/Build)

Job:Design/Build. Removal of the existing Methane gas detection equipment and the installation of methane and H2S sensors in (5) Redline stations. Sensors to be installed in all passenger stations and tunnels. Installation includes local and system wide testing.
Contr.:Robnett Electric, Inc
Contact:Walter Sparkuhl Contract Administrator MTA 213-922-7399
Completed:

MTA C0774 CLOSED CIRCUIT TELEVISION AT BUS DIVISIONS 5, 7, 9,AND 15. (Design/Build)

Job:Design and install a complete conduit system at the above Bus Divisions for CCTV cabling. Install power for equipment racks.
Contr.:Metro Video Systems
Contact:Awny Malak (MTA) (213) 922-6268
Completed:

MTA C0782 RETROFIT OF BUS WASH SYSTEMS AT DIVISION 5, 7, 10, AND 15. (Design/Build)

Job:Install a complete power and data conduit system at the above Bus Divisions for Bus wash equipment.
Contr.:NS Corporation
Contact:Raul Pedroza MTA (213) 922-7279
Completed:

LAX SIGNAGE AND WAYFINDING PROJECT

Job:Install power and lighting to new signage in CTA and to sign structures on Century/Sepulveda Blvd.’s.
Contr.:Peterson/Chase Construction
Contact:
Completed:2004